TECHNICAL STANDARDS // METHOD & QUALITY

Renovation quality is built into what lies beneath the surface

Substrate preparation, under-tile tanking, pressure-tested concealed MEP networks and clean co-ownership logistics: explore our concrete site commitments.

ENGAGEMENT 01

Full Protection of Retained Finishes & Communal Areas

Before work begins: heavy-duty floor protection, lift cabin and stairwell lining, dust extraction and daily end-of-shift site cleaning.

ENGAGEMENT 02

Rigorous Substrate Preparation Prior to Finishing

No finish is applied over an unstable base: fibre-reinforced floor levelling, SPEC liquid waterproofing in wet rooms, crack bridging and multi-coat skimming.

ENGAGEMENT 03

Mandatory Hold Points Before Closing Linings

Hydrostatic pressure tests on plumbing lines, electrical continuity checks and photographic routing records before boarding partitions.

ENGAGEMENT 04

Grazing-Light Inspection & Snag-Free Handover

Internal pre-handover inspection verifying every switch, tap, paint plane and window hardware adjustment prior to client walkthrough.

QUALIFICATIONS & INSURANCE CERTIFICATES

Documentary transparency for homeowners and project architects

ACTI-BAT holds a documented historical track record of RGE Qualibat / Eco Artisan qualification. In keeping with strict pre-launch accuracy, current-year Public Liability (RC Pro) and Ten-Year Construction (Décennale) insurance certificates along with active RGE certificate details are provided directly upon quotation.